Skip to content
Jordan PPP
Stained-glass illustration of robots and an AI tower, the art on the guide’s cover

Developers and builders

Launch a PPP program for Economic Zone and Industrial City Developers in Jordan

A free 17-page guide · The $500 trillion PPP infrastructure opportunity

What this guide is for

Your zone launches its own public-private partnership (PPP) program for its power, water, waste, telecom, logistics and industrial plots, with a lab for small PPPs and an open door to proposals from tenants.

The case

Zone developers hold the land, networks and tenants a PPP needs

Factories, warehouses and data centers choose where to locate by the cost and reliability of power, water, land and logistics, and zones compete on exactly those services. Zone and industrial city developers that deliver them through PPPs can expand faster, share the investment with private partners and offer tenants better infrastructure at known prices. This guide invites economic zone and industrial city developers in Jordan to launch a PPP program of their own, starting with the projects at home.

The guide

Build the $500 trillion PPP infrastructure opportunity into Jordan’s zones

Your zone launches a dedicated PPP program, with a small team, a master plan of projects that private partners can finance, build and operate, a lab for small PPPs and an open door to direct proposals from tenants, starting with Jordan’s $86 billion of projects and the $46 billion anchored in Aqaba.

  1. 01

    A master developer with private partners

    The zone keeps the master plan, the land and the rules, and private partners finance, build and operate the utilities, logistics and services inside it under PPP contracts, so the zone can grow at the pace its tenants need.

  2. 02

    Zone utilities as PPPs

    Power, water, wastewater treatment, waste and telecom networks can each be delivered as a PPP, with a partner paid for the service it delivers and tenants offered reliable supply at long-term prices.

  3. 03

    Logistics and industrial plots

    Warehouses, cold stores, container yards, rail sidings and ready-built factories can be developed by private partners on zone land, leased to tenants and handed back to the zone at the end of each contract.

  4. 04

    A smart zone

    A digital twin joins the zone’s utilities, plots, roads and gates in one live model, and robots inspect networks, move goods and watch the perimeter, so the zone runs on data and every partner reports against the same record.

  5. 05

    A lab and direct proposals

    Each zone tenders a PPP research lab that runs small pilots on its own land, and PPP Law No. 19 of 2023 accepts direct private proposals under Article 15. PPP Regulation No. 9 of 2024 defines small-scale PPPs below $14.1 million, so similar projects proposed by tenants can be bundled into one feasibility report and one tender.

Page 5 of the guide: The guide
Page 5 of 17 · The guide

Why economic zone and industrial city developers

Zone developers hold the land, networks and tenants a PPP needs

A PPP needs land, utilities, approvals and customers, and a zone developer controls or coordinates all four inside its boundary. That makes a zone one of the fastest places in a country to prepare a PPP, test a new technology on live assets and offer the result to tenants who are already there.

Where zone developers fit in a PPP

Land
Serviced plots and corridors that a partner can lease for a utility, a logistics park or a factory.
Utilities
Power, water, wastewater, waste and telecom networks that tenants need from their first day.
Approvals
Permits and approvals inside the zone, often through one window, that decide how quickly a partner can build.
Demand
Tenants whose contracts give a utility or logistics partner known customers and revenue.
Supervision
Measurement of service levels across the zone and payment to each partner for the results it delivers.

What changes for zone developers

AI, robotics and tokenization change how a zone is planned, run and financed. A digital twin shows the whole zone on live data, so utilities expand ahead of demand and faults are fixed before tenants notice. Robots inspect networks, move goods and watch gates around the clock, and tokenized stakes let tenants and regional investors finance the next phase of the zone from the revenue of the last.

Why a program, and why now

Without a program, a zone builds each network and warehouse from its own budget or signs one-off contracts, and growth waits on capital. A program gives the zone a team, standard contracts, a lab that tests new ideas on its own land and a clear route for proposals from tenants and partners. Jordan’s pipeline is large and early, and the zones that prepare their projects now will host the industries that grow around it.

Page 13 of the guide: Why economic zone and industrial city developers
Page 13 of 17 · Why economic zone and industrial city developers
Stained-glass illustration of glowing stepping stones along a glass wall, leading toward a sunrise and a distant city of towers

Futureproofing

Futureproof Economic Zone and Industrial City Developers in Jordan for the infrastructure singularity

This free 17-page guide shows how, with small PPPs in parallel, PPP research labs, artificial intelligence, robotics, tokenization and six first steps.

Stained-glass illustration of the Red Sea port of Aqaba at dawn

Jordan and Aqaba

An $86 billion pipeline to start with

Many of them sit in or beside an economic zone or industrial city and will draw on its land, utilities and logistics. A zone that proves a utility, logistics or smart-zone model on its own land can repeat it in every zone in the country.

$86B
of PPP and infrastructure projects in development in Jordan
$46B
of them anchored in Aqaba
  • Artificial intelligence

    AI lets a zone plan and run its land, utilities and services as one system. A digital twin forecasts power, water and traffic demand as tenants arrive, so each utility PPP is sized and priced correctly, and the same model schedules maintenance and flags faults once the assets run. A small zone team can also draft output specifications, compare bids on whole-life cost and answer tenant questions in hours.

  • Robotics

    Robotics lowers the cost of running a zone and raises what it offers tenants. Automated warehouses and yards move goods around the clock, drones and crawlers inspect pipes, substations and roads and report defects automatically, and robotic patrols watch gates and perimeters, so a zone can serve more tenants with a small operations team.

  • Tokenization

    Zone infrastructure suits tokenization, because utilities and leased plots earn contracted revenue from known tenants. A zone developer can tokenize stakes in its power, water or logistics assets, pay holders from tenant charges as they arrive and publish each asset’s performance to a shared registry, so tenants, workers and regional investors can own part of the zone they work in.

  • Small PPPs and research labs

    A zone suits a PPP research lab, because it holds land, networks and tenants willing to try new services in one place. Each zone can tender its own lab, pilot new utilities, logistics robots and smart-zone tools on its own plots and offer what works to every tenant, while the published failures teach the other zones as well.

  • Unsolicited proposals

    Direct proposals turn tenants and partners into a source of projects. A manufacturer that needs steady power, a logistics company that sees room for a cold store or a rail siding, or a utility partner with a better treatment plant can bring its idea forward under Article 15 at its own cost. The tender still tests the idea against the market, where the proposer can match the best offer, and a zone that publishes the services it wants improved receives proposals aimed at them.

The program

How the program could work

The program can sit inside the zone’s development team, with a PPP lead at its center and the land, networks and tenant relationships the zone already has behind it.

PPP team
A small team of planning, engineering, legal and finance staff that prepares, tenders and supervises the zone’s PPPs.
Master plan
A phased plan that marks which utilities, plots and services private partners will finance, build and operate.
Utilities
Power, water, wastewater, waste and telecom networks delivered as PPPs, with long-term prices offered to tenants.
Logistics and plots
Warehouses, cold stores, yards, rail sidings and ready-built factories developed with private partners on zone land.
Smart zone
A digital twin of the whole zone, with robotics in inspection, logistics and security written into every contract.
Lab and proposals
A research lab tendered as a PPP, a clear route for tenant proposals under Article 15 and small-scale PPPs below $14.1 million bundled into one tender.
Tokenized stakes
A pilot issue of tokenized stakes in one operating zone asset, offered to tenants and regional investors.

What the zone gains

The zone gains infrastructure ahead of demand without carrying all of the capital itself, partners who share the risk of each phase and tenants who receive reliable services at known prices. Each project adds standard contracts, data and staff who know how to run the next one, and each pilot in the lab shows tenants what the zone can offer before they sign.

It also gains a place at the front of how industry chooses where to locate. The first zones in the region to run on a digital twin, operate with robotics and offer tenants a stake in the infrastructure they use will set the standard that other zones follow.

Page 14 of the guide: The program
Page 14 of 17 · The program
Stained-glass illustration of glowing stepping stones rising toward a sunrise arch

Next steps

How a zone developer can start

Any economic zone or industrial city developer in Jordan can take this guide forward. The first steps use the land, networks and tenants the zone already has.

  1. 01

    Mandate

    A decision by the board to launch a PPP program, with its sectors, its first projects and its first-year goals.

  2. 02

    Team

    A named program lead, with planning, engineering, legal and finance staff drawn from the zone’s existing departments.

  3. 03

    Pipeline

    A list of the zone’s planned utilities, plots and services by stage, set beside Jordan’s $86 billion of projects to find the ones that will draw on the zone.

  4. 04

    Tenants

    Meetings with current and prospective tenants on the services they need and the proposals they could bring.

  5. 05

    Partners

    Utility operators, logistics companies, contractors, lenders, infrastructure funds and technology companies to complete each consortium.

  6. 06

    Pilot

    A first utility, logistics or lab project as a small-scale PPP or direct proposal, taken from idea to tender.

Jordan has the projects, zones with land and tenants, and a law that accepts unsolicited proposals. A PPP program gives your zone the partners, the lab and the pipeline to grow at the pace of its tenants and to host the industries of the superintelligent infrastructure future.

The full document

Inside this guide

Seventeen pages and thirteen sections, from the case for a PPP program to the first steps, written for economic zone and industrial city developers in Jordan.

Download the guide (PDF)
  1. 01IntroductionWhy a century of infrastructure needs rebuilding, and the $500 trillion it will take.p. 3
  2. 02The guideBuild the $500 trillion PPP infrastructure opportunity into Jordan’s zonesp. 5
  3. 03Jordan and AqabaAn $86 billion pipeline to start withp. 6
  4. 04Artificial intelligenceHow AI designs, structures and runs PPP projects, and what it means for economic zone and industrial city developers.p. 7
  5. 05RoboticsHow robots build infrastructure and keep it running, and what that means for economic zone and industrial city developers.p. 8
  6. 06TokenizationHow tokenization funds projects from their own revenue, and the role it opens for economic zone and industrial city developers.p. 9
  7. 07Small PPPs in parallelWhy many small PPPs teach a country faster than a few large ones.p. 10
  8. 08PPP research labsA lab in each sector, running ten small PPP projects a year.p. 11
  9. 09Unsolicited proposalsHow Jordan’s PPP law accepts direct proposals from private companies.p. 12
  10. 10Why economic zone and industrial city developersZone developers hold the land, networks and tenants a PPP needsp. 13
  11. 11The programThe program can sit inside the zone’s development team, with a PPP lead at its center and the land, networks and tenant relationships the zone already has behind it.p. 14
  12. 12AboutAbout Jordan PPP and what it offers.p. 15
  13. 13Next stepsHow a zone developer can start: six first steps.p. 16

Questions

Questions about the guide for Economic Zone and Industrial City Developers in Jordan

What does the guide for Economic Zone and Industrial City Developers in Jordan propose?
Your zone launches its own public-private partnership (PPP) program for its power, water, waste, telecom, logistics and industrial plots, with a lab for small PPPs and an open door to proposals from tenants.
Why should economic zone and industrial city developers in Jordan launch a PPP program?
Zone developers hold the land, networks and tenants a PPP needs. A PPP needs land, utilities, approvals and customers, and a zone developer controls or coordinates all four inside its boundary. That makes a zone one of the fastest places in a country to prepare a PPP, test a new technology on live assets and offer the result to tenants who are already there.
Which PPP projects can economic zone and industrial city developers in Jordan take part in?
Jordan has about $86 billion of PPP and infrastructure projects in development, $46 billion of them anchored in Aqaba. Many of them sit in or beside an economic zone or industrial city and will draw on its land, utilities and logistics. A zone that proves a utility, logistics or smart-zone model on its own land can repeat it in every zone in the country.
How can economic zone and industrial city developers in Jordan start a PPP program?
Any economic zone or industrial city developer in Jordan can take this guide forward. The first steps use the land, networks and tenants the zone already has. The guide sets out six first steps: mandate, team, pipeline, tenants, partners and pilot.
What does a PPP program give economic zone and industrial city developers in Jordan?
The zone gains infrastructure ahead of demand without carrying all of the capital itself, partners who share the risk of each phase and tenants who receive reliable services at known prices. Each project adds standard contracts, data and staff who know how to run the next one, and each pilot in the lab shows tenants what the zone can offer before they sign.
Is the guide for Economic Zone and Industrial City Developers in Jordan free?
Yes. It is free to read on this page and free to download as a 17-page PDF, with the case for a PPP program, Jordan’s pipeline, the role of AI, robotics and tokenization, the program and six first steps.